July 27, 201511 yr #14682 Nope.. just allowances and fringe benefits throwing me over the edge.Just means your paid well enough haha
July 28, 201511 yr #14683 I am so tired Got a day off today but still up at crack of assholes Not compared with the last two days All of u guys who travel for work I dunno how u do it I'm so knackered :(
July 29, 201511 yr #14685 Red lights mean stop Yeh I've stopped working on a friday arvo ffs u \!/ Love dealing with others heaps of chit on a friday Green means go New chit 4TW
July 29, 201511 yr #14686 Piece of piss....maybe I should do your job Good on you for being professional and you helped my OCD with everything being so neat and in place.A+ for effort LOL
July 29, 201511 yr #14687 Cable ties wrapped in opposite direction on same cable bundle.1/10 will go bang.
July 29, 201511 yr #14688 #prosparkoligist4LYFGo for it peter as a vast majority display my top pik as a new install ..... Fooking knuckle dragging yobbos
July 29, 201511 yr #14689 F120 FTL But.A story just for you jetThis is what I got given for a change over or recentlyI'm like yeahhhh erm I think its going to need a bit more gear...it's a 21 story building....with like fkn 50odd panel based outputs, send it back needs to be redone "can't job has to go ahead...can you do it? Put in a huge 2 days getting it ready...Done Drilled and tapped all the stand offs, made all the fkn ribbon cables to length ect...Trying to get the karnt out the door of my house by myself at 11pm the night before change overNearly had a fkn hernia hereNow, I said the evening before to my boss your going to have to cancel or get somebody else to do the changeover coz I'm farked, still have to write the program and work into the night to get the panel ready. So spent the next day like a zombie did the software side and was on hand to answer questions when required. Last time I saw the lads at 10pm, started at 7am.Come back on Monday to thisNow I need to spend a fkn week redoing it.. Oh and before any of this, this happened..the panels(evac as well) turned up in the wrong cabinets, so swap them around u say, nope the doors are hinged the wrong way, swap the internal doors? Nope perspex window isn't center, coveres sh*t it shouldn't and its a 150k job, that's rubbish. Strip the bitches down and rebuild and swap the cabinets.....and no I don't like ampac, particularly after all of that. Everything from the software to the paint on the cabinet is rubbish.
July 29, 201511 yr #14690 Oh and the conv cards on the left are temporary until everything becomes addressable, so never mind the sticky back cable tie mounting job...
Create an account or sign in to comment