Jump to content

New Build - Home Renovations - Gardens - Garages & Sheds.


Pixy Angel

Recommended Posts

  • 2 weeks later...
  • Bob the Freaking Builder
  • Donating Members
  • Member For: 14y 6m 16d
  • Gender: Female
  • Location: SA

Well... we are officially 3 months ahead of schedule.... *touch wood*... and I’m really happy.

All internal first fix is now complete, I made some minor adjustments to some things on the fly and had the Chippy and Plumber back in. 

Aircon ducting, full first fix electrical, plumbing and now roof all done, with the exception of a few panels going on tomorrow. 
Then by the end of this week it’s insulation and linings going on. 
 

Gas install (new services) happening on the 1st and power is now connected. 

Had the retaining and fencing contractor out this afternoon to go over some things and excited to see render for on the ground facade in the next couple weeks also so we can get driveway & perimeter concrete (exposed ag) done and then fencing. 
 

My diary is only heaps full every day... but really loving it. 🥰
 

XLOeUE5.jpg

VPQiTri.jpg

Edited by Mrs Jeturbo
  • Like 3
  • Thanks 1
Link to comment
Share on other sites

  • Is on holiday from communism
  • Member
  • Member For: 5y 2m 26d
  • Gender: Female
  • Location: Victoria

You can spend 30k on blinds. 

 

I'm flat out getting upset because they charge me 20 cents for sauce.

 

Link to comment
Share on other sites

  • Feeling the Love :-)
  • Bronze Donating Members
  • Member For: 10y 11m 26d
  • Gender: Male
  • Location: Cairns
3 hours ago, Mrs Jeturbo said:

Well... we are officially 3 months ahead of schedule....

this is awesome!!!!!

I don't know of anybody who's been ahead of schedule on a home build

99% of the time the builder is making excuses why things are taking so long :mole:

  • Like 1
Link to comment
Share on other sites

  • Bob the Freaking Builder
  • Donating Members
  • Member For: 14y 6m 16d
  • Gender: Female
  • Location: SA

Yeah I’ve been working really closely with my site supervisor to line everything up. 
Also I make an effort to go on site every day to either meet with trades or double check everything so there’s two sets of eyes on things and I’m there for consultation. Cuts out any confusion and let’s me oversee things. 
 

Matty (my site supervisor) has just been amazing and we bounce off each other really well, which is awesome, because you’re right, normally people just use excuses, but he’s appreciative of all the help I’ve been also, so we have a mutual respect. 
 

Making changes to plans on the fly is also something most home builds don’t get to go through without major issues and expense, so I appreciate I can just go on site as required and make changes and calls on things and he will call me if he needs me to decide on something and click of the fingers and it’s done.

Edited by Mrs Jeturbo
  • Like 1
Link to comment
Share on other sites

  • Feeling the Love :-)
  • Bronze Donating Members
  • Member For: 10y 11m 26d
  • Gender: Male
  • Location: Cairns

when we were doing our reno, my builder didn't show up for a month, said he was very busy with other jobs

ended up getting rid of him and getting another one in  :bopp:

  • Like 1
Link to comment
Share on other sites

  • Feeling the Love :-)
  • Bronze Donating Members
  • Member For: 10y 11m 26d
  • Gender: Male
  • Location: Cairns

yeah, he was a mate...................

 

me and Mrs BCB reckoned he just didn't want to do the job in the end

the new guy we got came in all gang busters like

we were totally blown away with the progress he made

but he wasn't cheap

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
  • Create New...
'