Battery relocation version 2 done. Optima D34 yellow top, optima D34 tray, Blue Sea isolator, 50mm2 double insulated welding cable, 10x50mm lugs, cable glands, a bit of black conduit and a few lengths of heatshrink. Should have done it this way the first time around. Ran the cables through the cab via the rear drivers side grommet and out the front through the grommet behind the passenger wheel well.
Tree all chopped up and stacked on the nature strip.
Insurance contacted - claim processing started.
I think that's enough effort for today - time for a beer